PEANUT BUTTER KITCHEN INSTALLATION

a large machine in a large building

SCOPE OF WORK

 

The project included the development of a complete control infrastructure for the new nut cream line, including preparation of design documentation, control cabinet prefabrication, and full electrical installation.

A key element of the project was the integration of the new installation with the existing bar production line, as well as with the current recipe management and reporting system. The implemented solutions ensured seamless communication between the technological lines, full control of process parameters, and consistent production management.

AUTOMATION OF THE NUT CREAM PRODUCTION LINE FOR BAR MANUFACTURING

 

We delivered a comprehensive project for the commissioning of a new nut cream production line, fully integrated with the existing bar preparation line.The scope of work covered the complete implementation cycle — from design and control cabinet prefabrication, through electrical installation, to software development and integration of control systems.

USED TECHNOLOGIES

Point I/O

A modular I/O system for distributed installations

FactoryTalk View SE

A scalable visualization system for line monitoring and supervision

GuardLogix L7

Advanced process and safety controllers

KEY PROJECT STATISTICS

300+

PROGRAMMED DEVICES

3

DISTRIBUTED I/O CABINETS

2

SKID-MOUNTED INSTALLATIONS

© 2025 ELMAR · Automatyka przemysłowa

kontakt@elmar-automatyka.pl

96-500 Kożuszki-Parcel

Kożuszki-Parcel 37,

ELMAR M. Bezler Sp.J.