PEANUT BUTTER KITCHEN INSTALLATION
The project included the development of a complete control infrastructure for the new nut cream line, including preparation of design documentation, control cabinet prefabrication, and full electrical installation.
A key element of the project was the integration of the new installation with the existing bar production line, as well as with the current recipe management and reporting system. The implemented solutions ensured seamless communication between the technological lines, full control of process parameters, and consistent production management.
We delivered a comprehensive project for the commissioning of a new nut cream production line, fully integrated with the existing bar preparation line.The scope of work covered the complete implementation cycle — from design and control cabinet prefabrication, through electrical installation, to software development and integration of control systems.
Point I/O
A modular I/O system for distributed installations
FactoryTalk View SE
A scalable visualization system for line monitoring and supervision
GuardLogix L7
Advanced process and safety controllers
KEY PROJECT STATISTICS
300+
PROGRAMMED DEVICES
3
2
© 2025 ELMAR · Automatyka przemysłowa
kontakt@elmar-automatyka.pl
96-500 Kożuszki-Parcel
Kożuszki-Parcel 37,
ELMAR M. Bezler Sp.J.