INSTALLATION AND COMMISSIONING
COMMISSIONING AND SYSTEM TESTING
After installation is completed, the system is commissioned. This stage includes:
Verification of connections – checking compliance with the documentation and verifying circuit continuity.
Control software configuration – downloading/uploading PLC programs, configuring communication interfaces, calibrating sensors, and setting drive operating parameters.
Functional testing – confirming that the system responds according to the defined control sequences, safety logic, and I/O signals.
Run tests and load testing – simulating or performing real production operating conditions.
PRECISION IN ASSEMBLY, CONFIDENCE IN OPERATION
INSTALLATION OF AUTOMATION SYSTEMS
It includes mechanical, electrical, and low-voltage (ELV) works, including:
Installation of control cabinets, HMI operator panels, and field devices/actuators.
Cable tray and conduit installation, cable routing, and pulling of signal, power, and communication cables.
Termination and connection of peripheral devices such as sensors, transmitters, drives, and actuators.
Identification and labeling of cables and components in accordance with the technical documentation.
Installation and commissioning of industrial automation systems are a key stage in implementing a technical solution, directly affecting its reliability, safety, and operational efficiency. This process includes both the physical installation of system components and software configuration, device parameterization, and testing to verify correct operation.